Installation Instructions
Aluminium Guttering
- Place gutter in position, fixing to fascia board at 500mm centres through oversize hole to allow for expansion and contraction using 32mm stainless steel screws and oversize washer.
- Allow 2mm expansion gap between lengths and components.
- Ensure all joint areas are clean, dry, dust and grease free prior to applying silicone sealant.
- Apply 2 no. generous beads of silicone sealant to each side of the joint.
- Place joint clip in position pressing down firmly until it clips into position.
- Using a cloth to protect the finish, press the joints into place using bent pliers.
- Remove any surplus sealant from faces of gutter.
- Aluminium gutters may be cut using a fine tooth hacksaw or power saw with aluminium blade. Ensure any burr is removed with a file.
- Ensure any cut ends are coated using the touch up paint provided.
- Brackets may be used if required. Brackets must be used with the 125 x 55mm XL half round gutter. Brackets should be fixed at 900mm centres however this should be reduced if snow load is a concern.
Aluminium Pipes
- Place rainwater pipe in correct position and mark wall through predrilled holes in ears of pipe.
- Drill wall using appropriate masonry bit.
- Use only stainless steel screws and place through washer provided.
- Fix through pre-drilled pipe ears using appropriate length screws and plugs to obviate pull out.
- When fixed securely, push on cover cap to conceal screw head.
- Ensure pipes are plumb and offer up next pipe or component.
- Fit in to socket leaving approx. 5mm gap for expansion and contraction.
- Joints between sections are left dry but can be pointed with silicone if required.
- Bobbins are available to ensure a straight line to rainwater pipes where the building surface may be uneven.
- Pipes may be cut to length using a fine tooth hacksaw or power saw with aluminium blade. Ensure any burr is removed with a file.